{"id":7814,"date":"2024-10-10T15:37:01","date_gmt":"2024-10-10T13:37:01","guid":{"rendered":"https:\/\/faber-solartechnik.de\/?page_id=7814"},"modified":"2026-10-31T23:25:11","modified_gmt":"2026-10-31T22:25:11","slug":"solarpark","status":"publish","type":"page","link":"https:\/\/faber-solartechnik.de\/en\/solarpark\/","title":{"rendered":"Planning and building solar parks"},"content":{"rendered":"<div data-elementor-type=\"wp-page\" data-elementor-id=\"7814\" class=\"elementor elementor-7814 elementor-bc-flex-widget\" data-elementor-post-type=\"page\">\n\t\t\t\t<div class=\"elementor-element elementor-element-da0fda09 e-flex e-con-boxed e-con e-parent\" data-id=\"da0fda09\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f22db58e elementor-widget elementor-widget-text-editor\" data-id=\"f22db58e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>One <strong>Solar park<\/strong> It is a photovoltaic system that is installed not on a roof but on a free area. Instead of individual modules on a few hundred square meters, here are megawatt-class systems that feed their electricity directly into the medium-voltage grid. For landowners, farmers, municipalities, energy cooperatives, and investors, this is one of the most reliable ways to use an area productively over two decades.<\/p>\n<h2>How a solar park is technically constructed<\/h2>\n<p>The modules are mounted on a supporting structure that is either built into the ground or erected on a foundation. Two common methods of construction are: <strong>shifted southwards<\/strong> for the highest annual yield, or <strong>East-West<\/strong> for a more even daily profile and denser coverage of the area. The direct current runs via string lines to the switchgear, from there via AC collectors to the substation, which transforms it to medium voltage. The final stage is the transfer station as the interface to the grid operator.<\/p>\n<p>In addition, there are things that are not visible on aerial photographs: wiring, fences, access routes, monitoring, and network and equipment protection. It is this last part that determines whether a park will be connected to the grid on time.<\/p>\n<h2>From the surface to the power connection<\/h2>\n<h3>Secure and check the area<\/h3>\n<p>The starting point is the area. Considerations include the size of the area, the slope, shading, the ground, and above all, the distance to the nearest suitable grid connection point. Only then can it be said with any certainty what kind of power supply is appropriate for the area.<\/p>\n<h3>Planning permission and building regulations<\/h3>\n<p>Most solar parks require a development plan. The municipality conducts the process, with a decision to proceed, the involvement of public interest stakeholders, and public disclosure. In parallel, expert reports on species protection, soil, and drainage are being prepared.<\/p>\n<h3>Mains connection<\/h3>\n<p>The application for grid connection with the grid operator takes place regardless of the building permit and is, in practice, the longest item on the schedule. The earlier it is submitted, the better.<\/p>\n<h3>Construction and commissioning<\/h3>\n<p>Frame installation, wiring, commissioning of stations, commissioning with the network operator. Those who entrust planning, delivery and construction in one hand keep this phase short and have a single point of contact for the results.<\/p>\n<h3>Operation<\/h3>\n<p>After commissioning, monitoring, technical operation management and maintenance are taken over. The system is in operation. <strong>Market data register<\/strong> to report to the Federal Network Agency.<\/p><p><img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/faber-solartechnik.de\/wp-content\/uploads\/2026\/09\/Heckhuscheid-FST-Referenz-1.avif\" alt=\"Solar park with battery storage from the air\" width=\"1024\" height=\"550\" \/><\/p>\n<h2>Which areas are suitable for a solar park<\/h2>\n<p>Which areas are subsidized are governed by \u00a7 37 of the EEG. These include, among other things:<\/p>\n<ul>\n<li>Areas in a <strong>500-meter wide strip<\/strong> along highways and certain rail routes<\/li>\n<li>Agricultural and grassland in <strong>disadvantaged areas<\/strong>, Except for moorlands and protected areas such as Natura 2000 sites, nature reserves and legally protected habitats<\/li>\n<li><strong>Conversion areas<\/strong>, For example, former military areas or landfills<\/li>\n<li>Areas within the scope of a corresponding development plan<\/li>\n<li>Special cases such as Moor photovoltaic systems on rewet areas, parking lot areas and floating systems on artificial bodies of water<\/li>\n<\/ul>\n<p>Whether a specific area falls under this applies to an on-site inspection. This can be clarified in advance before time is wasted on proceedings.<\/p>\n<h2>Promotion and marketing of electricity<\/h2>\n<p>For open-air facilities with <strong>more than 1 MW<\/strong> Installed capacity is a prerequisite for successful participation in a tender organized by the Federal Network Agency for funding (\u00a7 22, paragraph 3 of the EEG). Installations up to 1 MW can be funded without a tender if they meet one of the statutory remuneration criteria. The aggregate limits apply to the performance limits, so several installations can be combined.<\/p>\n<p>In addition to the EEG subsidy, direct marketing through a power supply contract with a buyer is a second route. Which route is the right one for a project depends on its size, location, and schedule.<\/p>\n<h2>Think about battery storage systems together<\/h2>\n<p>After a certain size, it is not the area of the bottleneck but the network connection that matters. <strong>Battery storage<\/strong> It shifts production peaks during times of higher demand and makes the feed-in more predictable. If it is planned from the outset, a single grid connection procedure is sufficient for both park and storage \u2014 this saves a complete second procedure.<\/p>\n<h2>Solar park with Faber Solar Technology<\/h2>\n<p>We implement solar parks turnkey, from the design phase through to delivery and commissioning. The medium-voltage technology comes from within the company itself: <a href=\"https:\/\/faber-etec.de\/\" target=\"_blank\" rel=\"noopener\">Faber E-Tec<\/a> manufactures transformer and transfer stations as well as storage solutions. This means that plant planning and station construction take place at the same time.<\/p>\n<p>Our projects implemented give an impression of what we are capable of. <a href=\"https:\/\/faber-solartechnik.de\/en\/referenzen\/\">References<\/a>. Whether you are offering a plot of land, handing over project rights, or want to have a park built turnkey \u2014 we are happy to discuss all the details directly. <a href=\"https:\/\/faber-solartechnik.de\/en\/kontakt\/\">Contact us<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-16d8cdac e-flex e-con-boxed e-con e-parent\" data-id=\"16d8cdac\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5bc4e4e2 elementor-widget-divider--view-line elementor-widget elementor-widget-divider\" data-id=\"5bc4e4e2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"divider.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-divider\">\n\t\t\t<span class=\"elementor-divider-separator\">\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bf2239a6 elementor-widget elementor-widget-heading\" data-id=\"bf2239a6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Frequently asked questions about the solar park<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5c362adc elementor-widget elementor-widget-n-accordion\" data-id=\"5c362adc\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;default_state&quot;:&quot;expanded&quot;,&quot;max_items_expended&quot;:&quot;one&quot;,&quot;n_accordion_animation_duration&quot;:{&quot;unit&quot;:&quot;ms&quot;,&quot;size&quot;:400,&quot;sizes&quot;:[]}}\" data-widget_type=\"nested-accordion.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"e-n-accordion\" aria-label=\"Accordion. Open links with Enter or Space, close with Escape, and navigate with Arrow Keys\">\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-1540\" class=\"e-n-accordion-item\" open>\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"1\" tabindex=\"0\" aria-expanded=\"true\" aria-controls=\"e-n-accordion-item-1540\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> How much area does a solar park need? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><i aria-hidden=\"true\" class=\"fas fa-minus\"><\/i><\/span>\n\t\t\t<span class='e-closed'><i aria-hidden=\"true\" class=\"fas fa-plus\"><\/i><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1540\" class=\"elementor-element elementor-element-dd61cd54 e-flex e-con-boxed e-con e-child\" data-id=\"dd61cd54\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1350c8df elementor-widget elementor-widget-text-editor\" data-id=\"1350c8df\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>This depends on the module type, mounting method and row spacing. As a guideline from our open space projects: For approximately one megawatt of installed power, roughly one hectare is required. An east-west layout requires a closer spacing between the rows, while an upright south orientation requires more distance between the rows.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-1541\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"2\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-1541\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Does a solar park need a development plan? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><i aria-hidden=\"true\" class=\"fas fa-minus\"><\/i><\/span>\n\t\t\t<span class='e-closed'><i aria-hidden=\"true\" class=\"fas fa-plus\"><\/i><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1541\" class=\"elementor-element elementor-element-685eae09 e-flex e-con-boxed e-con e-child\" data-id=\"685eae09\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-e5c398f3 elementor-widget elementor-widget-text-editor\" data-id=\"e5c398f3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>In most cases, yes. Open-air installations are only permitted in limited areas outside the city limits. Therefore, the municipality conducts a planning procedure. Within the privileged areas under \u00a7 37 of the EEG, the procedure remains manageable because the basic suitability of the area is already legally established.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-1542\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"3\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-1542\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> At what size is an advertisement necessary? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><i aria-hidden=\"true\" class=\"fas fa-minus\"><\/i><\/span>\n\t\t\t<span class='e-closed'><i aria-hidden=\"true\" class=\"fas fa-plus\"><\/i><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1542\" class=\"elementor-element elementor-element-8a321420 e-flex e-con-boxed e-con e-child\" data-id=\"8a321420\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-3b50b190 elementor-widget elementor-widget-text-editor\" data-id=\"3b50b190\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Starting at an installed power of more than 1 MW, successful participation in a tender by the Federal Network Agency is a prerequisite for funding (\u00a7 22, paragraph 3 of the EEG). This includes the statutory remuneration. It should be noted that adjacent installations can be combined under \u00a7 24 of the EEG.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-1543\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"4\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-1543\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> What takes the longest time in a solar park? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><i aria-hidden=\"true\" class=\"fas fa-minus\"><\/i><\/span>\n\t\t\t<span class='e-closed'><i aria-hidden=\"true\" class=\"fas fa-plus\"><\/i><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1543\" class=\"elementor-element elementor-element-c128f0e9 e-flex e-con-boxed e-con e-child\" data-id=\"c128f0e9\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-3e25700b elementor-widget elementor-widget-text-editor\" data-id=\"3e25700b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>As a rule, the connection to the grid. The request for the connection to the grid should therefore be submitted as early as possible, in parallel with the planning process and not afterwards. The construction itself is the shortest part of the project if the preparation is good.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-1544\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"5\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-1544\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Is a battery storage system worth installing in a solar park? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><i aria-hidden=\"true\" class=\"fas fa-minus\"><\/i><\/span>\n\t\t\t<span class='e-closed'><i aria-hidden=\"true\" class=\"fas fa-plus\"><\/i><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1544\" class=\"elementor-element elementor-element-10194834 e-flex e-con-boxed e-con e-child\" data-id=\"10194834\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-cc1cffb7 elementor-widget elementor-widget-text-editor\" data-id=\"cc1cffb7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Whenever the grid connection limits the input or the marketing benefits from a more even profile. The crucial moment is when the storage is planned from the beginning; it operates in the same grid connection process as the park.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Ein Solarpark ist eine Photovoltaikanlage, die nicht auf einem Dach, sondern auf einer Freifl\u00e4che entsteht. Statt einzelner Module auf wenigen hundert Quadratmetern stehen hier Anlagen im Megawattbereich, die ihren Strom direkt in das Mittelspannungsnetz einspeisen. F\u00fcr Fl\u00e4cheneigent\u00fcmer, Landwirte, Kommunen, Energiegenossenschaften und Investoren ist das eine der verl\u00e4sslichsten M\u00f6glichkeiten, eine Fl\u00e4che \u00fcber zwei Jahrzehnte hinweg produktiv [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":14278,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-7814","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/pages\/7814","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/comments?post=7814"}],"version-history":[{"count":5,"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/pages\/7814\/revisions"}],"predecessor-version":[{"id":15358,"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/pages\/7814\/revisions\/15358"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/media\/14278"}],"wp:attachment":[{"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/media?parent=7814"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}