{"id":14763,"date":"2026-09-16T16:57:15","date_gmt":"2026-09-16T14:57:15","guid":{"rendered":"https:\/\/faber-solartechnik.de\/?p=14763"},"modified":"2026-11-01T03:15:55","modified_gmt":"2026-11-01T02:15:55","slug":"oelde-ennigerloh","status":"publish","type":"post","link":"https:\/\/faber-solartechnik.de\/en\/projekte\/oelde-ennigerloh\/","title":{"rendered":"Oelde \/ Ennigerloh"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"14763\" class=\"elementor elementor-14763 elementor-bc-flex-widget\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-7ce57a6 e-flex e-con-boxed e-con e-parent\" data-id=\"7ce57a6\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-bbf7459 elementor-widget elementor-widget-text-editor\" data-id=\"bbf7459\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Solar park as EPC project: 11,732 kWp for Oelde and Ennigerloh<\/h2>\n<p>A solar park as an EPC project means for the developer: a contract, a responsible party, and a completion date. For LichtBlick SE, we have arranged between Oelde and Ennigerloh: <strong>Intermunicipal solar park \u201eIn der Hoest\u201c<\/strong> with <strong>11,732 kWp<\/strong> It has been built. Since May 2025, it has been feeding.<\/p>\n<h3>Project at a glance<\/h3>\n<ul><li><strong>11,732.0 kWp<\/strong> Overall performance<\/li><li><strong>approx. 9.90 ha<\/strong> Area divided into <strong>three plant fields<\/strong><\/li><li><strong>Bifacial modules<\/strong> by RISEN<\/li><li>Inverter <strong>Huawei SUN2000-215KTL-H0<\/strong><\/li><li>FEAG compact transformer station with <strong>3,150-kVA transformer<\/strong>, 10\/0.8 kV<\/li><li>Area within the municipalities <strong>Oelde and Ennigerloh<\/strong>, Warendorf district<\/li><li><strong>Commissioning May 2025<\/strong><\/li><\/ul>\n<h3>Why a solar park is awarded as an EPC project<\/h3>\n<p>Large open space projects rarely fail due to technology. They fail because of space, permits, and because no one takes overall responsibility.<\/p>\n<p>Here, a special feature came into play: The suitable areas were located in two municipalities \u2013 Oelde and Ennigerloh. A park across the municipal boundary means coordination with two municipalities and a permitting process that involves both parties. This resulted in the name: the Intermunicipal Solar Park \u201eIn der Hoest\u201c.<\/p>\n<h3>What a solar park includes as an EPC project<\/h3>\n<p>EPC stands for Engineering, Procurement, Construction \u2013 planning, procurement and construction under a contract. Specifically, this included the planning of permits, including fire protection and evidence management, the development and fencing of the three plant fields, the complete modular and sub-structure assembly, the station planning, and the connection to the grid and commissioning.<\/p>\n<h3>Technical implementation<\/h3>\n<p>The park is divided into three areas covering around 9.90 hectares, each of which is independently accessed and fenced in. The areas were previously undeveloped and used for agricultural purposes.<\/p>\n<p>They are equipped with bifacial modules from RISEN. Bifacial technology additionally uses the light reflected from the ground on the module back side \u2013 on open areas with a bright surface, a measurable increase in output from the same area. On the inverter side, Huawei SUN2000-215KTL-H0 is used. The feed-in runs via a 3,150 kVA transformer compact station from 10 to 0.8 kV.<\/p>\n<h3>Result<\/h3>\n<p>Since May 2025, the park has been generating electricity. From just under ten hectares of agricultural land, 11.7 MWp of installed power has been generated \u2013 one of the largest of our completed open-air projects.<\/p><h3>Each facility is publicly registered<\/h3><p>A solar park as an EPC project also means reporting obligations: Every production facility is subject to reporting obligations. <a href=\"https:\/\/www.marktstammdatenregister.de\/MaStR\" target=\"_blank\" rel=\"noopener\">Market data register of the Federal Network Agency<\/a>. We will take over the registration as part of the project.<\/p><h3>Are you planning a solar park as an EPC project?<\/h3><p>Whether for an existing project or based on the area \u2013 we take on the overall responsibility right up to commissioning. <a href=\"https:\/\/faber-solartechnik.de\/en\/kontakt\/\">Contact us<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-35db5cef e-flex e-con-boxed e-con e-parent\" data-id=\"35db5cef\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c8c73e93 elementor-widget-divider--view-line elementor-widget elementor-widget-divider\" data-id=\"c8c73e93\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"divider.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-divider\">\n\t\t\t<span class=\"elementor-divider-separator\">\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ca5bd56d elementor-widget elementor-widget-heading\" data-id=\"ca5bd56d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Medium-voltage technology from Faber E-Tec<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3b0dff6f elementor-widget elementor-widget-text-editor\" data-id=\"3b0dff6f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The medium-voltage technology was supplied by Faber E-Tec from within the company group: four substations and the transfer station to the network operator. The planning, manufacturing and commissioning thus took place within the group.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-3957fde2 e-con-full e-flex e-con e-child\" data-id=\"3957fde2\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d61f96b2 elementor-widget elementor-widget-button\" data-id=\"d61f96b2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/faber-etec.de\/solarparkstation\/\" target=\"_blank\" rel=\"noopener\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">View the solar power station<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8b0f566e elementor-widget elementor-widget-button\" data-id=\"8b0f566e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/faber-etec.de\/uebergabestation\/\" target=\"_blank\" rel=\"noopener\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">View the transfer station<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-61dec86 e-flex e-con-boxed e-con e-parent\" data-id=\"61dec86\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-930d6a6 elementor-widget-divider--view-line elementor-widget elementor-widget-divider\" data-id=\"930d6a6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"divider.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-divider\">\n\t\t\t<span class=\"elementor-divider-separator\">\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e060f8a elementor-widget elementor-widget-heading\" data-id=\"e060f8a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Frequently Asked Questions<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-16bc736 elementor-widget elementor-widget-n-accordion\" data-id=\"16bc736\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;default_state&quot;:&quot;all_collapsed&quot;,&quot;max_items_expended&quot;:&quot;one&quot;,&quot;n_accordion_animation_duration&quot;:{&quot;unit&quot;:&quot;ms&quot;,&quot;size&quot;:400,&quot;sizes&quot;:[]}}\" data-widget_type=\"nested-accordion.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"e-n-accordion\" aria-label=\"Accordion. Open links with Enter or Space, close with Escape, and navigate with Arrow Keys\">\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2380\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"1\" tabindex=\"0\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2380\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> How much area does a solar park with around 11 MWp need? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><i aria-hidden=\"true\" class=\"fas fa-chevron-up\"><\/i><\/span>\n\t\t\t<span class='e-closed'><i aria-hidden=\"true\" class=\"fas fa-chevron-down\"><\/i><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2380\" class=\"elementor-element elementor-element-ac6770e e-con-full e-flex e-con e-child\" data-id=\"ac6770e\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-01ce81b elementor-widget elementor-widget-text-editor\" data-id=\"01ce81b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The park in Oelde\/Ennigerloh uses approximately 9.90 ha for 11,732 kWp, distributed over three system fields. The required area depends on module technology, row spacing, and terrain conditions \u2013 the load-bearing figure is provided by the occupancy planning for your area.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2381\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"2\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2381\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Can a solar park be built across two municipal boundaries? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><i aria-hidden=\"true\" class=\"fas fa-chevron-up\"><\/i><\/span>\n\t\t\t<span class='e-closed'><i aria-hidden=\"true\" class=\"fas fa-chevron-down\"><\/i><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2381\" class=\"elementor-element elementor-element-059ba7c e-con-full e-flex e-con e-child\" data-id=\"059ba7c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-15f6861 elementor-widget elementor-widget-text-editor\" data-id=\"15f6861\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Yes. The Intermunicipal Solar Park \u201eIn der Hoest\u201c is located in the districts of Oelde and Ennigerloh. This requires coordination with both municipalities and the appropriate zoning of the land \u2013 technically, it remains a cohesive park.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2382\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"3\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2382\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> What do bifacial modules bring to the open space? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><i aria-hidden=\"true\" class=\"fas fa-chevron-up\"><\/i><\/span>\n\t\t\t<span class='e-closed'><i aria-hidden=\"true\" class=\"fas fa-chevron-down\"><\/i><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2382\" class=\"elementor-element elementor-element-efa7f85 e-con-full e-flex e-con e-child\" data-id=\"efa7f85\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-ec8669e elementor-widget elementor-widget-text-editor\" data-id=\"ec8669e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>In addition, they use the light reflected from the ground on the back of the module. On elevated open-air installations with a flat surface, this results in an increase in output from the same area. In Oelde\/Ennigerloh, bifacial modules from RISEN are installed.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2383\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"4\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2383\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> What exactly does an EPC partner do? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><i aria-hidden=\"true\" class=\"fas fa-chevron-up\"><\/i><\/span>\n\t\t\t<span class='e-closed'><i aria-hidden=\"true\" class=\"fas fa-chevron-down\"><\/i><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2383\" class=\"elementor-element elementor-element-061d14e e-con-full e-flex e-con e-child\" data-id=\"061d14e\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-381789c elementor-widget elementor-widget-text-editor\" data-id=\"381789c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Engineering, Procurement, Construction \u2013 planning, procurement and construction under one contract. In Oelde\/Ennigerloh, the scope of work included planning, development, installation, station planning and connection to the grid until commissioning.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2384\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"5\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2384\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Does a solar park need its own substation? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><i aria-hidden=\"true\" class=\"fas fa-chevron-up\"><\/i><\/span>\n\t\t\t<span class='e-closed'><i aria-hidden=\"true\" class=\"fas fa-chevron-down\"><\/i><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2384\" class=\"elementor-element elementor-element-6acaff9 e-con-full e-flex e-con e-child\" data-id=\"6acaff9\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8d76e42 elementor-widget elementor-widget-text-editor\" data-id=\"8d76e42\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>At this scale, yes. In Oelde\/Ennigerloh, a transformer compact station with 3,150 kVA and a conversion ratio of 10 to 0.8 kV is in operation. The required station is determined by the system capacity and the point of connection to the grid.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Intermunicipal solar park \u201eIn der Hoest\u201c: 11,732 kWp on approximately 9.9 ha in the municipalities of Oelde and Ennigerloh, built as an EPC partner for LichtBlick.<\/p>","protected":false},"author":2,"featured_media":14242,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[322,9],"tags":[],"class_list":["post-14763","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-freiland","category-projekte"],"acf":[],"_links":{"self":[{"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/posts\/14763","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/comments?post=14763"}],"version-history":[{"count":5,"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/posts\/14763\/revisions"}],"predecessor-version":[{"id":15395,"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/posts\/14763\/revisions\/15395"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/media\/14242"}],"wp:attachment":[{"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/media?parent=14763"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/categories?post=14763"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/tags?post=14763"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}