{"id":14765,"date":"2026-09-16T16:58:34","date_gmt":"2026-09-16T14:58:34","guid":{"rendered":"https:\/\/faber-solartechnik.de\/?p=14765"},"modified":"2026-11-01T03:15:54","modified_gmt":"2026-11-01T02:15:54","slug":"munster-alvern","status":"publish","type":"post","link":"https:\/\/faber-solartechnik.de\/en\/projekte\/munster-alvern\/","title":{"rendered":"Munster Alvern"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"14765\" class=\"elementor elementor-14765\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-21eab4c e-flex e-con-boxed e-con e-parent\" data-id=\"21eab4c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a495b48 elementor-widget elementor-widget-text-editor\" data-id=\"a495b48\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Solar park with battery storage: 3,092 kWp in Munster-Alvern<\/h2>\n<p>A solar park with a battery storage system can then feed its electricity when it is needed \u2013 instead of always when the sun is shining. In Munster-Alvern in the Niedersachsen district of Heidekreis, we have a free-standing system with <strong>3,091.9 kWp<\/strong> and one <strong>Storage with 6,687 kWh<\/strong> realized.<\/p>\n<h3>Project at a glance<\/h3>\n<ul><li>3,091.9 kWp from two construction phases<\/li><li><strong>Battery storage with a capacity of 6,687 kWh and a power output of 3,343 kW<\/strong><\/li><li>Extension to <strong>7,520 kWh<\/strong> applied to the network operator<\/li><li>City of Munster, district of Heidekreis, Lower Saxony<\/li><li>Own planning permission: Development plan No. 99 \u201eFreifl\u00e4chen-Photovoltaikanlage Alvern\u201c<\/li><li>Network: EWE Netz and Stadtwerke Munster<\/li><\/ul>\n<h3>Why a solar park with a battery storage system<\/h3>\n<p>Without storage, a free-standing system delivers its power concentrated around midday \u2013 exactly when all the other systems are doing the same thing. <strong>Solar farm with battery storage<\/strong> Uncoupling generation and feed-in: The electricity is stored in reserve and then delivered when the grid can absorb it.<\/p>\n<p>In Munster-Alvern, the storage facility is located with <strong>6,687 kWh at 3,343 kW<\/strong> Designed \u2013 that is, around two hours of full load. This design is typical for projects that are intended to smooth out peak production levels without over-sizing the park. The extension to 7,520 kWh has been applied for.<\/p>\n<h3>From the area to the planning of construction<\/h3>\n<p>The project was not created on a fully landscaped area. The city of Munster has provided the land for this purpose. <strong>Development plan No. 99<\/strong> Special building regulations were created. The procedure included, among other things, a technical contribution on nature conservation and a report on glare protection.<\/p>\n<p>The park was realized in <strong>two construction phases<\/strong>. This arrangement allows the first section to be installed while the second is still being built.<\/p>\n<h3>Mains connection<\/h3>\n<p>The feed runs via the network of <strong>EWE Netz<\/strong> and the Stadtwerke Munster. In the case of storage parks, the grid connection is the most demanding part: it must simultaneously represent generation and storage capacity, and the regulation of both components must work in a grid-compliant manner.<\/p><h3>Each facility is publicly registered<\/h3><p>Solar park with battery storage also means reporting obligations: Every generation facility is registered. <a href=\"https:\/\/www.marktstammdatenregister.de\/MaStR\" target=\"_blank\" rel=\"noopener\">Market data register of the Federal Network Agency<\/a>. We will take over the registration as part of the project.<\/p><h3>Are you planning a solar park with a battery storage system?<\/h3><p>We plan the park and storage together and implement both using the grid connection procedure. <a href=\"https:\/\/faber-solartechnik.de\/en\/kontakt\/\">Contact us<\/a>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-a46a36b0 e-flex e-con-boxed e-con e-parent\" data-id=\"a46a36b0\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-6e47d0b2 elementor-widget-divider--view-line elementor-widget elementor-widget-divider\" data-id=\"6e47d0b2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"divider.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-divider\">\n\t\t\t<span class=\"elementor-divider-separator\">\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-32313dc6 elementor-widget elementor-widget-heading\" data-id=\"32313dc6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Medium-voltage technology from Faber E-Tec<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9f32cb6f elementor-widget elementor-widget-text-editor\" data-id=\"9f32cb6f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>For the network connection, he supplied <strong>Faber E-Tec<\/strong> from within the company\u2019s own group, a transformer station with 3,150 kVA and the transfer station. Both components are manufactured in-house, thus perfectly matching the plant\u2019s design.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-c82d9bb6 e-con-full e-flex e-con e-child\" data-id=\"c82d9bb6\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-e255d942 elementor-widget elementor-widget-button\" data-id=\"e255d942\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/faber-etec.de\/uebergabestation\/\" target=\"_blank\" rel=\"noopener\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">View the transfer station<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ff9f5515 elementor-widget elementor-widget-button\" data-id=\"ff9f5515\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/faber-etec.de\/referenzen\/\" target=\"_blank\" rel=\"noopener\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">References from Faber E-Tec<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-bbe16b2 e-flex e-con-boxed e-con e-parent\" data-id=\"bbe16b2\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-572f31d elementor-widget-divider--view-line elementor-widget elementor-widget-divider\" data-id=\"572f31d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"divider.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-divider\">\n\t\t\t<span class=\"elementor-divider-separator\">\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-681746b elementor-widget elementor-widget-heading\" data-id=\"681746b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Frequently Asked Questions<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f29172f elementor-widget elementor-widget-n-accordion\" data-id=\"f29172f\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;default_state&quot;:&quot;all_collapsed&quot;,&quot;max_items_expended&quot;:&quot;one&quot;,&quot;n_accordion_animation_duration&quot;:{&quot;unit&quot;:&quot;ms&quot;,&quot;size&quot;:400,&quot;sizes&quot;:[]}}\" data-widget_type=\"nested-accordion.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"e-n-accordion\" aria-label=\"Accordion. Open links with Enter or Space, close with Escape, and navigate with Arrow Keys\">\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2540\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"1\" tabindex=\"0\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2540\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> How large must the storage capacity be for a solar park? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><i aria-hidden=\"true\" class=\"fas fa-chevron-up\"><\/i><\/span>\n\t\t\t<span class='e-closed'><i aria-hidden=\"true\" class=\"fas fa-chevron-down\"><\/i><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2540\" class=\"elementor-element elementor-element-6284c36 e-con-full e-flex e-con e-child\" data-id=\"6284c36\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-72f624a elementor-widget elementor-widget-text-editor\" data-id=\"72f624a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>It depends on the target. In Munster-Alvern, 3,091.9 kWp of generation is matched by a storage system with 6,687 kWh at 3,343 kW \u2013 around two hours of full load. Those who want to smooth out peak production are usually in this range; for trading on the electricity market, longer periods are planned.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2541\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"2\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2541\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> What do the kWh and kW designations on the battery storage system mean? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><i aria-hidden=\"true\" class=\"fas fa-chevron-up\"><\/i><\/span>\n\t\t\t<span class='e-closed'><i aria-hidden=\"true\" class=\"fas fa-chevron-down\"><\/i><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2541\" class=\"elementor-element elementor-element-42bacb1 e-con-full e-flex e-con e-child\" data-id=\"42bacb1\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-ffe4bed elementor-widget elementor-widget-text-editor\" data-id=\"ffe4bed\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>kWh is the capacity, i.e. how much energy the storage system absorbs. kW is the power, i.e. how fast it charges and discharges. In Munster-Alvern it is 6,687 kWh at 3,343 kW. Both values are always mentioned together.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2542\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"3\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2542\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Does a solar park need its own development plan? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><i aria-hidden=\"true\" class=\"fas fa-chevron-up\"><\/i><\/span>\n\t\t\t<span class='e-closed'><i aria-hidden=\"true\" class=\"fas fa-chevron-down\"><\/i><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2542\" class=\"elementor-element elementor-element-31cc413 e-con-full e-flex e-con e-child\" data-id=\"31cc413\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8950e75 elementor-widget elementor-widget-text-editor\" data-id=\"8950e75\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Often yes. For Munster-Alvern, the city of Munster has specifically created building regulations for the \u201eFreifl\u00e4chen-Photovoltaikanlage Alvern\u201c development plan No. 99. This includes a regular technical report on nature conservation and a glare protection report.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2543\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"4\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2543\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Why is a solar park being built in stages? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><i aria-hidden=\"true\" class=\"fas fa-chevron-up\"><\/i><\/span>\n\t\t\t<span class='e-closed'><i aria-hidden=\"true\" class=\"fas fa-chevron-down\"><\/i><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2543\" class=\"elementor-element elementor-element-f15a293 e-con-full e-flex e-con e-child\" data-id=\"f15a293\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1a658cb elementor-widget elementor-widget-text-editor\" data-id=\"1a658cb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Because the first section can be fed while work is still being carried out on the second one. Munster-Alvern was built in two construction phases, which significantly reduces the time until the first yield is achieved.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2544\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"5\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2544\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Can a memory be expanded later? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><i aria-hidden=\"true\" class=\"fas fa-chevron-up\"><\/i><\/span>\n\t\t\t<span class='e-closed'><i aria-hidden=\"true\" class=\"fas fa-chevron-down\"><\/i><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2544\" class=\"elementor-element elementor-element-8beb0bd e-con-full e-flex e-con e-child\" data-id=\"8beb0bd\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-11d6bdf elementor-widget elementor-widget-text-editor\" data-id=\"11d6bdf\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Basically, yes, if the grid connection supports the additional power. For Munster-Alvern, the extension from 6,687 to 7,520 kWh has been applied for with the grid operator. The review always takes place through the grid operator.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Solar park with battery storage in Munster-Alvern: 3,091.9 kWp from two construction phases, storage with 6,687 kWh and 3,343 kW, extension applied for.<\/p>","protected":false},"author":2,"featured_media":14238,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[322,9],"tags":[],"class_list":["post-14765","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-freiland","category-projekte"],"acf":[],"_links":{"self":[{"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/posts\/14765","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/comments?post=14765"}],"version-history":[{"count":5,"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/posts\/14765\/revisions"}],"predecessor-version":[{"id":15394,"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/posts\/14765\/revisions\/15394"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/media\/14238"}],"wp:attachment":[{"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/media?parent=14765"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/categories?post=14765"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/faber-solartechnik.de\/en\/wp-json\/wp\/v2\/tags?post=14765"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}