Solar park repowering with storage: 3,234 kWp in Rödinghausen
Solar park repowering means: An existing area is redeveloped and expanded with current technology, instead of taking up a new area. In Schwarzen Weg in Rödinghausen, this has resulted in: 3,234 kWp become – supplemented by a Battery storage system with 5,851 kWh.
Project at a glance
- 3,234 kWp total output after repowering and expansion
- Battery storage system with 5,851 kWh and 2.8 MW from seven cubes
- Location: Schwarzer Weg, Rödinghausen, North Rhine-Westphalia
- Distribution network operator: Westfalen Weser
- The network connection process for the storage system is underway
Why solar park repowering makes sense
An area that is already being used as a solar park brings advantages that a new area only needs to work out: the building regulations exist, the access is available, the grid connection point is known, and the acceptance locally is clear.
Solar park repowering It uses exactly that. Modern modules deliver significantly more power on the same surface than the generation before it. In Rödinghausen, an expansion was added, so that today 3,234 kWp are installed.
The memory as the second component
The park was supplemented by a Battery storage system with 5,851 kWh capacity and 2.8 MW power, built from seven Cubes. This modular construction has a practical advantage: The units are delivered pre-assembled and only need to be placed and connected on site.
The grid connection process for the storage facility is being carried out by the distribution network operator Westfalen Weser. Storage facilities on the medium-voltage grid undergo the same certification process as generation facilities.
Each facility is publicly registered
Repowering of solar parks also means reporting obligations: Every generation facility is subject to reporting obligations. Market data register of the Federal Network Agency. We will take over the registration as part of the project.
Do you have a solar park that is getting old?
We assess how much power can be achieved on your existing area using current technology – and whether a storage system can be added. Contact us.
Medium-voltage technology from Faber E-Tec
Medium-voltage technology was Faber E-Tec from within the own company group: a substation with 3,150 kVA as well as the technology for the battery storage system. This makes it possible to plan the solar park and storage system as a single unit from the very beginning.
Frequently Asked Questions
What does solar park repowering mean?
An existing open-air system is being redeveloped using modern technology. Modern modules deliver significantly more power on the same area. In Rödinghausen, 3,234 kWp have been installed after repowering and expansion.
Why is repowering worth considering compared to a new area?
Because building regulations, access, grid connection point and acceptance on site already exist. These four points are the most time-consuming part of a new project. Repowering significantly shortens the path to grid connection.
Can an existing solar park be supplemented with a storage system?
Yes, if the grid connection supports the additional power. In Rödinghausen, a battery storage system with 5,851 kWh and 2.8 MW is being added. The grid connection process is being carried out by the distribution grid operator.
What are Cubes in a battery storage system?
Prefabricated storage units that are delivered as complete modules. The storage facility in Rödinghausen consists of seven Cubes. On-site installation and connection are the only steps required, which reduces the construction time.
Does a battery storage system need its own certification?
On the medium-voltage grid, yes. The storage units undergo the same procedure as generation facilities, including the plant certificate and commissioning declaration. We handle the procedure with the network operator.