One Solar park It is a photovoltaic system that is installed not on a roof but on a free area. Instead of individual modules on a few hundred square meters, here are megawatt-class systems that feed their electricity directly into the medium-voltage grid. For landowners, farmers, municipalities, energy cooperatives, and investors, this is one of the most reliable ways to use an area productively over two decades.
How a solar park is technically constructed
The modules are mounted on a supporting structure that is either built into the ground or erected on a foundation. Two common methods of construction are: shifted southwards for the highest annual yield, or East-West for a more even daily profile and denser coverage of the area. The direct current runs via string lines to the switchgear, from there via AC collectors to the substation, which transforms it to medium voltage. The final stage is the transfer station as the interface to the grid operator.
In addition, there are things that are not visible on aerial photographs: wiring, fences, access routes, monitoring, and network and equipment protection. It is this last part that determines whether a park will be connected to the grid on time.
From the surface to the power connection
Secure and check the area
The starting point is the area. Considerations include the size of the area, the slope, shading, the ground, and above all, the distance to the nearest suitable grid connection point. Only then can it be said with any certainty what kind of power supply is appropriate for the area.
Planning permission and building regulations
Most solar parks require a development plan. The municipality conducts the process, with a decision to proceed, the involvement of public interest stakeholders, and public disclosure. In parallel, expert reports on species protection, soil, and drainage are being prepared.
Mains connection
The application for grid connection with the grid operator takes place regardless of the building permit and is, in practice, the longest item on the schedule. The earlier it is submitted, the better.
Construction and commissioning
Frame installation, wiring, commissioning of stations, commissioning with the network operator. Those who entrust planning, delivery and construction in one hand keep this phase short and have a single point of contact for the results.
Operation
After commissioning, monitoring, technical operation management and maintenance are taken over. The system is in operation. Market data register to report to the Federal Network Agency.
Which areas are suitable for a solar park
Which areas are subsidized are governed by § 37 of the EEG. These include, among other things:
- Areas in a 500-meter wide strip along highways and certain rail routes
- Agricultural and grassland in disadvantaged areas, Except for moorlands and protected areas such as Natura 2000 sites, nature reserves and legally protected habitats
- Conversion areas, For example, former military areas or landfills
- Areas within the scope of a corresponding development plan
- Special cases such as Moor photovoltaic systems on rewet areas, parking lot areas and floating systems on artificial bodies of water
Whether a specific area falls under this applies to an on-site inspection. This can be clarified in advance before time is wasted on proceedings.
Promotion and marketing of electricity
For open-air facilities with more than 1 MW Installed capacity is a prerequisite for successful participation in a tender organized by the Federal Network Agency for funding (§ 22, paragraph 3 of the EEG). Installations up to 1 MW can be funded without a tender if they meet one of the statutory remuneration criteria. The aggregate limits apply to the performance limits, so several installations can be combined.
In addition to the EEG subsidy, direct marketing through a power supply contract with a buyer is a second route. Which route is the right one for a project depends on its size, location, and schedule.
Think about battery storage systems together
After a certain size, it is not the area of the bottleneck but the network connection that matters. Battery storage It shifts production peaks during times of higher demand and makes the feed-in more predictable. If it is planned from the outset, a single grid connection procedure is sufficient for both park and storage — this saves a complete second procedure.
Solar park with Faber Solar Technology
We implement solar parks turnkey, from the design phase through to delivery and commissioning. The medium-voltage technology comes from within the company itself: Faber E-Tec manufactures transformer and transfer stations as well as storage solutions. This means that plant planning and station construction take place at the same time.
Our projects implemented give an impression of what we are capable of. References. Whether you are offering a plot of land, handing over project rights, or want to have a park built turnkey — we are happy to discuss all the details directly. Contact us.
Frequently asked questions about the solar park
How much area does a solar park need?
This depends on the module type, mounting method and row spacing. As a guideline from our open space projects: For approximately one megawatt of installed power, roughly one hectare is required. An east-west layout requires a closer spacing between the rows, while an upright south orientation requires more distance between the rows.
Does a solar park need a development plan?
In most cases, yes. Open-air installations are only permitted in limited areas outside the city limits. Therefore, the municipality conducts a planning procedure. Within the privileged areas under § 37 of the EEG, the procedure remains manageable because the basic suitability of the area is already legally established.
At what size is an advertisement necessary?
Starting at an installed power of more than 1 MW, successful participation in a tender by the Federal Network Agency is a prerequisite for funding (§ 22, paragraph 3 of the EEG). This includes the statutory remuneration. It should be noted that adjacent installations can be combined under § 24 of the EEG.
What takes the longest time in a solar park?
As a rule, the connection to the grid. The request for the connection to the grid should therefore be submitted as early as possible, in parallel with the planning process and not afterwards. The construction itself is the shortest part of the project if the preparation is good.
Is a battery storage system worth installing in a solar park?
Whenever the grid connection limits the input or the marketing benefits from a more even profile. The crucial moment is when the storage is planned from the beginning; it operates in the same grid connection process as the park.