Oelde / Ennigerloh

Oelde / Ennigerloh
Intermunicipal solar park „In der Hoest": 11,732 kWp on approximately 9.9 ha in the districts of Oelde and Ennigerloh, built as an EPC partner for LichtBlick.

Solar park as EPC project: 11,732 kWp for Oelde and Ennigerloh

A solar park as an EPC project means for the developer: a contract, a responsible party, and a completion date. For LichtBlick SE, we have arranged between Oelde and Ennigerloh: Intermunicipal solar park „In der Hoest“ with 11,732 kWp It has been built. Since May 2025, it has been feeding.

Project at a glance

  • 11,732.0 kWp Overall performance
  • approx. 9.90 ha Area divided into three plant fields
  • Bifacial modules by RISEN
  • Inverter Huawei SUN2000-215KTL-H0
  • FEAG compact transformer station with 3,150-kVA transformer, 10/0.8 kV
  • Area within the municipalities Oelde and Ennigerloh, Warendorf district
  • Commissioning May 2025

Why a solar park is awarded as an EPC project

Large open space projects rarely fail due to technology. They fail because of space, permits, and because no one takes overall responsibility.

Here, a special feature came into play: The suitable areas were located in two municipalities – Oelde and Ennigerloh. A park across the municipal boundary means coordination with two municipalities and a permitting process that involves both parties. This resulted in the name: the Intermunicipal Solar Park „In der Hoest“.

What a solar park includes as an EPC project

EPC stands for Engineering, Procurement, Construction – planning, procurement and construction under a contract. Specifically, this included the planning of permits, including fire protection and evidence management, the development and fencing of the three plant fields, the complete modular and sub-structure assembly, the station planning, and the connection to the grid and commissioning.

Technical implementation

The park is divided into three areas covering around 9.90 hectares, each of which is independently accessed and fenced in. The areas were previously undeveloped and used for agricultural purposes.

They are equipped with bifacial modules from RISEN. Bifacial technology additionally uses the light reflected from the ground on the module back side – on open areas with a bright surface, a measurable increase in output from the same area. On the inverter side, Huawei SUN2000-215KTL-H0 is used. The feed-in runs via a 3,150 kVA transformer compact station from 10 to 0.8 kV.

Result

Since May 2025, the park has been generating electricity. From just under ten hectares of agricultural land, 11.7 MWp of installed power has been generated – one of the largest of our completed open-air projects.

Each facility is publicly registered

A solar park as an EPC project also means reporting obligations: Every production facility is subject to reporting obligations. Market data register of the Federal Network Agency. We will take over the registration as part of the project.

Are you planning a solar park as an EPC project?

Whether for an existing project or based on the area – we take on the overall responsibility right up to commissioning. Contact us.

Medium-voltage technology from Faber E-Tec

The medium-voltage technology was supplied by Faber E-Tec from within the company group: four substations and the transfer station to the network operator. The planning, manufacturing and commissioning thus took place within the group.

Frequently Asked Questions

The park in Oelde/Ennigerloh uses approximately 9.90 ha for 11,732 kWp, distributed over three system fields. The required area depends on module technology, row spacing, and terrain conditions – the load-bearing figure is provided by the occupancy planning for your area.

Yes. The Intermunicipal Solar Park „In der Hoest“ is located in the districts of Oelde and Ennigerloh. This requires coordination with both municipalities and the appropriate zoning of the land – technically, it remains a cohesive park.

In addition, they use the light reflected from the ground on the back of the module. On elevated open-air installations with a flat surface, this results in an increase in output from the same area. In Oelde/Ennigerloh, bifacial modules from RISEN are installed.

Engineering, Procurement, Construction – planning, procurement and construction under one contract. In Oelde/Ennigerloh, the scope of work included planning, development, installation, station planning and connection to the grid until commissioning.

At this scale, yes. In Oelde/Ennigerloh, a transformer compact station with 3,150 kVA and a conversion ratio of 10 to 0.8 kV is in operation. The required station is determined by the system capacity and the point of connection to the grid.