Skip to content
Home
EPC
Close EPC
Open EPC
EPC partner for energy projects: new builds and integration into existing systems
We provide end-to-end engineering, in-house concrete construction and on-time grid integration. A depth of manufacturing that sets standards in Germany.
Send project enquiry
Photovoltaics
Substations
Battery storage
NSHV
Lease land
Company
Closing companies
Open businesses
Welcome to Faber Solartechnik GmbH
We plan, build and expand solar parks including high-performance BESS storage systems. As your EPC partner, we accompany energy projects from initial planning to turnkey grid integration.
Instagram
LinkedIn
YouTube
facebook
References
Close references
open references
Ballenstedt
Reference projects of Faber Solartechnik
Completed projects by Faber E-Tec: transformer substations, transfer stations and battery energy storage systems for PV installations and charging infrastructure throughout Germany.
Open land
Rooftop
Career
End career
Open career
Jobs | Careers at Faber Solartechnik
Help shape the crisis-proof infrastructure of the energy transition through modern medium-voltage technology, BESS and innovative PV projects.
Vacancies
News
Close News
Open News
Rödinghausen Logistics Center
Latest news on the energy transition & grid infrastructure
All contributions
News
Projects
Innovation
Events
Social network
LinkedIn
Instagram
facebook
Twitter
YouTube
Contact us
Close Contact
Open Contact
Contact
Request forms
Customer support
Hotline (+49) 05223 . 65708 00
Dresden (+49) 0351 . 79995 200
FAQ: Questions and answers
Search
English (UK)
Deutsch
English (UK)
Deutsch
Menu
Our portfolio
Photovoltaics in practice: reference projects for commercial enterprises and investors
about
0
Projects completed
>
0
MWp
Currently under construction
>
0
MWp
Planned
Munster Alvern
Solar park with 3,091.9 kWp and battery storage with 6,687 kWh in Lower Saxony.
Adelheidsdorf
500 kWp on the roofs of the Hengstprüfunganstalt of the Landgestüt Celle.
Gommern
Roof-mounted photovoltaics on agricultural shed roofs in Gommern, Jerichower Land district – designed and implemented turnkey.
Ardey Spring in Dortmund
Large project for the beverage group Hövelmann, presented in the employee magazine.
Damme
500 kWp on agricultural buildings in the district of Vechta, as a full-load power supply system.
Hüllhorst
750 kWp roof-mounted in Hüllhorst, Kreis Minden-Lübbecke – designed for maximum self-consumption, with 713,418 kWh
Kolkwitz
300 kWp installed on a commercial roof in Kolkwitz, Spree-Neiße district – designed to produce 304,940 kWh
Location
Around 860 kWp on the roof of a logistics center in Lage, Lippe district – implemented turnkey
Projects
Rooftop
Open land
Search
Search
Pfaffenhofen
Solar park with 5,672.16 kWp for an energy cooperative in Pfaffenhofen a.d. Ilm.
Falkenberg / Elster
Off-site solar power plant with 7,200 kWp in Brandenburg, including ongoing technical support.
Porta Westfalica
Solar Park Vennebeck in Porta Westfalica: 6.12 MWp with a planned battery storage system of 10,870 kWh and 5.2
Munster Alvern
Solar park with 3,091.9 kWp and battery storage with 6,687 kWh in Lower Saxony.
Oelde / Ennigerloh
Intermunicipal solar park „In der Hoest": 11,732 kWp on approximately 9.9 ha in the districts of Oelde
Rödinghausen Solar Park
Repowering to 3,234 kWp, supplemented by a battery storage system with 5,851 kWh.
Heckhuscheid
Solar park with large storage facility in Heckhuscheid: 17,767.5 kWp in the East and West fields, plus 15,470
Ardey Spring in Dortmund
Large project for the beverage group Hövelmann, presented in the employee magazine.
Vechta
2,100 kWp roof-mounted in Vechta, Lower Saxony – designed to produce 1,986,541 kWh per year with surplus feed-in.
Aschersleben
950 kWp installed on the roof of Novo-Tech in Aschersleben, designed for 901,752 kWh per year.
Ballenstedt
Combined PV system in Ballenstedt: 250 kWp on the roof of the hall, 500 kWp on the open space, shared
Schkeuditz
1,400 kWp installed on a flat roof in Schkeuditz, Nordsachsen district.
Kolkwitz
300 kWp installed on a commercial roof in Kolkwitz, Spree-Neiße district – designed to produce 304,940 kWh
Klingenberg
Approximately 300 kWp in Klingenberg, Saxony – roof area covered and connected separately, designed
Bad Salzuflen
686 kWp in Bad Salzuflen, combined in staggered and roof-parallel configuration, designed to produce 579,094 kWh per year
Detmold
498.225 kWp on eight roof surfaces, roof-parallel and staggered, with its own transfer station.
Winsen
672 kWp roof-mounted in Winsen an der Luhe, Harburg district – Complete feed system with 609,024 kWh
Damme
500 kWp on agricultural buildings in the district of Vechta, as a full-load power supply system.
Bohmte
500 kWp roof-mounted in Bohmte near Osnabrück as a full-load power generation system, designed to produce 434,914 kWh per year.
Adelheidsdorf
500 kWp on the roofs of the Hengstprüfunganstalt of the Landgestüt Celle.
Menu
Home
EPC
Company
References
Career
News
Contact us
English
English (UK)
Deutsch